Production and quality control
The Foshan plant runs two CNC machining centres, two panel saws, three presses and one edge-milling machine, with output up to 50,000 m² of panel per month. A 1 m² order and a container order therefore follow the same route: drawing approved, cutting programmed, edges machined on the same equipment, whatever the volume.
Panels are cut and machined at the factory to your cutting list, so the site only assembles. No saw dust in a live washroom, no last-minute trimming, and a replacement panel can be re-cut from the same batch if one gets damaged during installation.
- Incoming check: thickness, shade and batch are verified before cutting.
- Cutting and edge: dimensions and edge sealing are checked against the drawing, not by eye.
- Marking: every panel is labelled to its cubicle number, so nothing has to be matched up on site.
- Packaging: foam, protective film and plywood crates on pallets, with loading photos on request.
- Documents: panel test reports, cutting list, packing list and a reference project list on request, sent with the shipment.
Compare partition materials
Same washroom brief, five material routes. The highlighted row is this page.
| Material | Best for | Moisture and cleaning | Panel build | Cost band | Lead time |
|---|---|---|---|---|---|
| HPL compact laminate | High-traffic public washrooms | Waterproof solid core, wipe-clean surface, graffiti resistant | 12 or 18 mm solid core, black or colour | Mid to premium | 15 days |
| Stainless steel 304 / 316 | Airports, stadiums, industrial sites | Fully waterproof, impact resistant, easy to sanitise | 1.0 to 1.2 mm brushed or mirror skin | Premium | 15 days |
| Aluminium honeycomb | Tall cubicles, large cladding panels | Waterproof aluminium core, flat over long spans | HPL face on honeycomb core, 10 to 20 mm | Mid | 15 days |
| PVC foam board | Schools, gyms, budget fit-outs | Waterproof, chemical resistant, light weight | 10 to 18 mm foam PVC | Economy | 15 days |
| Melamine faced chipboard | Dry offices, staff rooms, vanities | Moisture-resistant grade only, not for wet zones | 18 mm MFC with ABS edge banding | Economy | 15 days |
| Hardware: 304 stainless, zinc alloy | Any cubicle or locker system | Corrosion resistant, replaceable on site | Hinges, locks, indicator latches, legs | Add-on per unit | 15 days |
Installation and maintenance FAQ
Can melamine cubicles be used in wet areas?
No. MFC is for dry or occasionally humid areas. Wet zones need compact HPL, PVC or stainless steel.
What edge finish do you use?
ABS edge banding on all four sides to limit moisture ingress at the joints.
Is MFC cheaper than HPL?
Yes, it is a budget option with a shorter lifespan in humid climates.
Where is MFC usually specified?
Offices, staff rooms, dry changing areas and vanity units.
What is the MOQ?
1 SQM for panels and boards, 1 set for a complete cubicle or locker run.
What is the lead time?
15 days production from approved drawing, plus sea freight to your port.
How are goods packed for export?
Foam and film protection, plywood crates, palletised and marked before loading.
From drawing to container
MOQ from 1 SQM · 15 days production · export plywood crates








Every batch is inspected panel by panel and photographed before loading. Ask for the loading photos of your order.



Selected projects
- Moisture-resistant cubicles with HPL wall claddingCommercial mall, Lagos
- Moisture-resistant cubicles for an office fit-outSelangor, Malaysia






