Skip to main content

vitalbuilding.co

Contact Us

How would you like to contact us?

Contact Us Page WhatsApp Enquiry Telegram Enquiry +86 188 2664 3676

Lockers: Panel Thickness and Specification Options

Panel thickness, panel sizes and component specification options for Lockers are reviewed here, so buyers can match the panel gauge and fixing details to the expected usage level and washroom layout. Relevant project sectors include Schools, universities, corridor and campus storage.

Overview

Phenolic HPL lockers suit dry and damp changing areas where waterproof performance, impact resistance and ventilated doors are required. Rigid PVC lockers are selected for poolside and aquatic environments because they resist chlorine, moisture and corrosion. Sloping-top, antibacterial and cleanroom-grade finishes address specific hygiene and maintenance requirements.

Compartment dimensions, door count, hanging rods, bench integration, ventilation and lock system are coordinated with the changing-room layout. Coin-return and token-operated lockers serve public water parks and pools; smart RFID, NFC and fingerprint systems support corporate coworking, fitness and high-traffic shared facilities.

Key characteristics

  • Mechanical, combination, coin-return / token, RFID wristband, keypad, NFC and biometric fingerprint locks
  • Ventilated doors, hanging rods, integrated bench seating, sloping-top and antibacterial medical options
  • 12 mm solid phenolic HPL and 15 mm rigid PVC panel construction
  • Single-tier, two-tier, multi-tier, six-tier box-style and space-saving L-shaped Z-tier layouts

Typical applications

  • Gyms, fitness clubs, spas and wellness changing rooms
  • Swimming pools, water parks and aquatic centre locker areas
  • Schools, universities, corridor and campus storage
  • Offices, factories, cleanrooms, laboratories and medical changing facilities

Send your drawings to Vital for CAD shop drawings, finish samples and a factory BOQ quote. Panel sizes, hardware, finishes and clearances are coordinated against your project layout; final specifications should be reviewed together with the contractor’s drawings and local building requirements.

Leave a Reply

Your email address will not be published. Required fields are marked *